While fixing the bridges here, we needed to identify the problem of where was all the water coming from to create our erosion problem. On the west side of #1 bridge we recognized that all the water from the fairway and rough drained straight down the cart path to the bridge. Well this was a major problem because of the large amount of runoff that comes after wet weather. The idea is to install a large basin to collect all that water and send it down a 12" drain. So first Matt Chase shaped the basin in with a Bobcat and then I came in with the mini-x to dig the trench. Once we put the pipe in we back filled the trench and redid the cart path. We still have a couple of loose ends to tie-up because we were racing the weather so any rain runoff would get to the newly fixed bridge abutment.