3/25/11

Cart Path Repairs

Demolition of #1 cart path



Finished #1



Setting the forms for #2 cart path





Finished #2



Finished #10



Demolition #18 cart path.



Landscape fabric laid down before adding material #18.



Finished #18

As many of you know we have had some cart paths that were in need of repair. We were given the go ahead to begin fixing our worst paths on holes 1, 2, 7, 10 and 18. As of today we have finished four holes with #7 being our last to do, which is planned for Monday. To do the repairs we first needed to break out all the existing concrete and remove it from the site. We then came in with a machine called a jumping jack to help compact the soil into a more level surface which was then covered with a landscape fabric. For the last step we added crusher run, which is a material that will firm up over time, at a 6 inch depth and then compacted with the jumping jack.
By fixing these problem areas we are hopeful that it will reduce unneeded wear and tear on our equipment and golf carts. For those of you wondering what we did with all the concrete we broke out we will be using that as erosion control under our bridges as we fix them.